Lead Time

posts displayed by category

Metal Kettle

Posted on June 28, 2013 in - 0

High fidelity kettle prototype constructed out of milled aluminum and stainless.  Soft-touch handle touchpoints with flip-open lid. Production cost 50% lower than average industry quotes.  Turn around time 10 days.

Read more

Stainless Bin

Posted on June 28, 2013 in - 0

Formed stainless steel bin 8′ x 8′ x 16′ custom formed with milled stainless handle & soft touch insert, brushed body and brushed handle.  Production cost 65% lower than average industry quotes.  Production time 15 days.

Read more

Espresso Machine

Posted on June 28, 2013 in - 0

Capsule Espresso Machine high fidelity model.  Constructed out of painted ABS UV coated, aluminum, acrylic, and silicon.  Fully operational handle and lever system.  Production cost 40% lower than average industry quotes.  Turn around time 13 days.

Read more