High Fidelity Model

posts displayed by category

Metal Kettle

Posted on June 28, 2013 in - 0

High fidelity kettle prototype constructed out of milled aluminum and stainless.  Soft-touch handle touchpoints with flip-open lid. Production cost 50% lower than average industry quotes.  Turn around time 10 days.

Read more

Espresso Machine

Posted on June 28, 2013 in - 0

Capsule Espresso Machine high fidelity model.  Constructed out of painted ABS UV coated, aluminum, acrylic, and silicon.  Fully operational handle and lever system.  Production cost 40% lower than average industry quotes.  Turn around time 13 days.

Read more